The S1000D Program Start Checklist
Twenty decisions, four phases, in the order they should be made. Programs that settle these before authoring spend their budget on content; programs that don't meet every one of them again at delivery review prices. Print this page and work through it.

The Checklist
Twenty Decisions, In Order

Contract & Governance
- The contracted S1000D issue is confirmed in writing. Issues 4.1, 4.2, 5.0 and 6 are all in active use — and with Issue 7 now released, the gap between newest and contracted just widened. Authoring to the wrong issue produces data the program cannot accept.
- The business rules layer is identified, and you hold a copy. ATA Spec 1000BR, MIL-STD-3031, MIL-STD-3048, or program-specific rules — the rules define most of what compliance means.
- Business rules will be captured as BREX, not only as a document. Rules enforced at authoring time are configuration; rules in a PDF are advice that gets discovered broken at delivery review.
- Every delivery obligation is enumerated. Page-based, IETP, portal, raw data exchange — each output owed shapes authoring decisions made months earlier.
- You know who accepts the data, and against what. Schema validation, BREX conformance, and editorial review are different gates; find out which ones your customer runs.
Data Architecture
- The SNS is agreed — with engineering in the room. The Standard Numbering System is the product breakdown every Data Module Code will encode; retrofitting it means renumbering the library.
- DMC conventions are settled and written down. The business rules constrain the code's fields, but conventions within them are the program's to fix — once, early.
- The DMRL exists and has a named owner. The Data Module Requirements List turns scope into a count. Without it, the estimate is a guess and progress is an opinion.
- The applicability strategy is decided. Which configurations drive filtering, and how they are modeled — solved with copies instead, the library diverges by the first revision.
- Common and repeated information has a reuse plan. Warnings, cautions, and shared data that every module needs are the first content to fragment when each author recreates them.
- Illustration and ICN conventions are set. Graphics carry their own identifiers and revision life; treating them as attachments loses both.
Production Readiness
- The CSDB has an owner, a workflow, and a backup regime. It is an operational system, not a license — the program's single source deserves the care given to any production database.
- The authoring environment enforces the BREX. This is where non-compliant content is cheapest to catch: at the keystroke, not at the delivery review.
- A publish-early milestone is on the schedule. The first PDF or IETP built from real data modules surfaces integration problems while they are still cheap to fix.
- Legacy conversion was sampled before it was priced. The bulk converts predictably; the exception structures set the budget, and they only show up in a real sample.
- QA gates are defined per stage, not saved for the end. Content that fails validation at delivery was authored weeks earlier, by someone who has moved on.
Supply Chain & People
- Supplier data conventions are agreed before suppliers author. Two compliant suppliers can still deliver data you cannot combine; the rules have to reach the whole chain.
- Training is planned per role, not per license. Authors, illustrators, managers, and reviewers need different depths — and the program needs them before content volume arrives.
- The revision and change process is defined up front. S1000D content lives as data through sustainment; how a change enters, routes, and republishes is program infrastructure.
- One named authority answers business-rules questions. Every unanswered rules question becomes an author's improvisation, and improvisations compound.
The reasoning behind the sequence lives on our S1000D reference page — and if the contract behind your program is still being read, start with the TM contract review checklist, because half the items above are answered there.